Submission of offers under a public procurement procedure with the subject-matter: “Supply of Flow Control Valves for GMS 1 of IGB Gas Pipeline, Komotini, Hellenic Republic“
The scope of the contract includes the delivery of two 16" flow control valves with technical parameters in accordance with the Technical Specification. The warranty period of the valves shall not be less than 24 months from the date of delivery. Delivery and handover of technical documentation – no later than 300 (three hundred) calendar days from the date of signing the contract. Place of delivery: Gas Metering Station 1 of IGB Gas pipeline in Komotini, Republic of Greece.
Offers may be submitted by 23:59 EET on 26.03.2026 via the CAIS EPP platform functionalities.
More information on the terms and conditions of the procurement, including documentation, technical specification, performance requirements, method of submission of offers, etc., is available on the buyer profile of ICGB AD in CAIS EPP on https://app.eop.bg/today/558557
Έργο IGB
Ο Διασυνδετήριος Αγωγός Φυσικού Αερίου Ελλάδας-Βουλγαρίας συγχρηματοδοτείται από το Ταμείο Ανάκαμψης του
Προγράμματος Ενέργειας της Ευρωπαικής Ένωσης.
Η αποκλειστική ευθύνη αυτής της δημοσίευσης ανήκει στον συγγραφέα.
Η Ευρωπαϊκή Ένωση δεν ευθύνεται για οποιαδήποτε χρήση των πληροφοριών που εμπεριέχονται σε αυτήν.
